Recent Projects
Radiation Oncology (Still Under Construction)
Renovations to the existing Radiation Oncology suite.
[back to
capital projects]
Colon Cancer Prevention Program
A new program, part of the Neag Comprehensive Cancer Center at the UConn Health Center, aimed at the prevention of cancer.
[back to
capital projects]
Henry B.C. Low, MD Learning Center
Transformation of the former 'Link Room' into the Henry
B.C. Low, MD Learning Center, a high-end distance learning
facility.
[back to
capital projects]
Lyman Maynard Stowe Library
Renovations to the library bringing it from a facility
designed in the 1960s to one that can serve the Health
Center in the 21st Century.
[back to
capital projects]
CT Scan
Recent renovation to the CT Scan included new equipment,
finishes and HVAC.
[back to
capital projects]
Jean Marie Colbert Lobby
Renovated Hospital 6th Floor Elevator lobby dedicated as the Jean Marie Colbert Cancer Center Inpatient Unit.
[back to
capital projects]
Emergency Department
Recent renovations to the ED expand capacity from 12 to 18 treatment beds, new central nurses station and more registration areas.
[back to
capital projects]
Blood Draw
The Blood Draw area was redesigned to provide increased
work efficiencies and better patient flow.
[back to
capital projects]
Newborn
To provide increased capacity for 'well baby' deliveries,
a procedure room was renovated to accommodate additional
basinets. The procedure room was relocated and a formula
prep room was added.
[back to
capital projects]
Charlotte Johnson Hollfelder Center for Women's Health
The color scheme celebrates the donor's Swedish lineage.
[back to
capital projects]
Dental Clinic
The waiting room was enclosed to provide privacy for patients.
[back to
capital projects]
Operating Room (OR) 10
Due to increased demand for surgical space, two offices
and an equipment storage room were turned into the tenth OR.
Its primary use is for same day surgery procedures done in
the Surgicenter.
[back to
capital projects]
Human Resources Reception
To allow for the expansion of Human Resources, the reception area was moved to the lobby of the Administrative Services Building (ASB).
[back to
capital projects]
Interventional Radiology
While not designed in-house, this project shows the
level of complexity capable of being managed by the
department. This project replaced existing equipment with
newer technology, creating a 'State-of-the-Art' Angio-suite.
[back to
capital projects]
East Hartford Renovation
Space renovated to provide better patient flow and confidentiality.
[back to capital projects] |